Skip to content
Practice cases
ManufacturingBeginner

Map the Causes of Coating Defects

Create a balanced cause map and convert priority branches into evidence tests.

18 minutes

Scenario

A metal-parts plant saw coating defects rise from 2.1% to 5.4% on Line 3 over six weeks. The plant manager believes the new operators are responsible.

Your role
Quality improvement facilitator
Method
Ishikawa Diagram

Evidence pack

e1

People

Three operators joined, but defect rates rose on shifts with and without new staff.

e2

Machine

Nozzle pressure varies beyond the maintenance target twice per shift.

e3

Material

A new coating batch entered use four days before the increase.

e4

Method

The cleaning interval changed from 4 hours to 6 hours.

e5

Measurement

Thickness gauge calibration is current; sampling fell from 10 to 5 parts per hour.

e6

Environment

Humidity exceeded the process range on 9 of 30 days.

Constraints

  • The diagram cannot be used as proof.
  • Priority must be based on impact, plausibility and test value.
  • At least one popular hypothesis must be challenged with evidence.

Case steps

Work through each prompt using the evidence pack. Answers and rubric weights stay protected in the interactive flow.

1
Open Response

Write the effect statement with line, rate and period.

2
Structured

Place e1–e6 into cause families and add one plausible sub-cause for any three branches.

3
Open Response

Choose three hypotheses to test first and justify priority.

4
Structured

Define a test that could support or reject each priority hypothesis.