HELIOS Outpost

Keep critical service safe as the binding constraint moves between fuel, filters, generation and demand.

System context

A damaged transport corridor prevents parts and fuel delivery. The outpost can reduce customer load but not equally.

Your role

You direct a remote energy installation isolated for twenty-one days.

Constraints

  • Fuel runway is twenty-six days at current load.
  • Low-power operation accelerates filter contamination.
  • A second generator failure requires unavailable parts.

Evidence pack

e1

Demand option

Two customers can shift 20% of load without safety impact.

e2

Fuel response

A 12% load reduction extends fuel runway from 26 to 34 days.

e3

Filter response

Below 62% output, filter life falls by 35%.

e4

Generator condition

Vibration on generator B is rising but remains below shutdown threshold.

Interactive simulation

Three connected decisions

Keep critical service safe as the binding constraint moves between fuel, filters, generation and demand.

This case, its world, organisations, places and events are original Methodfield material and do not reproduce a protected fictional universe.